(301) 330-1650

Palihotel San Diego

HR Construction completed a full-scale renovation of the historic St. James building in the Gaslamp district of downtown San Diego to include (122) guestrooms and corridors, lobby, meeting space, restaurant/bar, basement, elevator cabs, and a rooftop. The scope of the project included replacement of all original waste/vent piping stacks, fire alarm system upgrade, new TPO roof, exterior painting, historic window replacement, installation of in-room AC units along with new millwork, paint, flooring, plumbing, lighting, and tile finished throughout. Truly a transformation of one of the most iconic buildings in San Diego.

CONTACT US

PROJECT DESCRIPTION

  • Category: Hospitality
  • Scope: Guestroom + Public Spaces
  • Location: San Diego, CA
  • Owner/Client: Dovetail + Co.
  • Contract Value: $9.2 Million
  • Project Duration: 11 Months
  • Year Completed: 2023

PROJECT DETAILS

  • Full-scale renovation of the historic St. James building
  • Built 122 guestrooms and corridors, lobby, meeting space, restaurant/bar, basement, elevator cabs, and rooftop
  • Replaced original waste/vent piping stacks
  • Upgraded fire alarm system
  • Added new TPO roof
  • Painted the exterior
  • Replaced historic windows
  • Install in-room AC units with new millwork, paint, flooring, plumbing, lighting, and tile finishes
NEWH DC Chapter,
Gold Maven Sponsor
AGC of America
Allied Member SM Seal
International Hospitality Institute