(301) 330-1650
  • Crystal Gateway Marriott common space, lobby seating
  • Crystal Gateway Marriott high top seating
  • Renovated hotel public space at the Crystal Gateway Marriott
  • Renovated lounge at the Crystal Gateway Marriott
  • Renovated bar at the Crystal Gateway Marriott

Crystal Gateway Marriott

Crystal Gateway Marriott

The Crystal Gateway Marriott is located in Arlington, Virginia, just miles from downtown Washington, DC and Ronald Reagan Washington National Airport. This four-star hotel offers many amenities ranging from guest rooms and suites to 39,983 square feet of event space. HR Construction transformed many of the spaces in which guests are able to luxuriously enjoy themselves. These spaces consist of: the M-Club, Lobby, Restaurant, Meeting Area and Fitness Center. 

CONTACT US

Category:
Hospitality

Location:
Arlington, VA

Owner:
Remington Lodging & Hospitality, LLC

Architect:
George Sarfatty, AIA

Contract Value:
$2 Million

Duration:
86 Days

  • Completed the redesign & layout of the M-Club Lounge & Kitchen, including new spacious seating area, and a new bar & lounge area
  • Added structural steel to carry new store-front glass windows to provide overhead support of new glass doors
  • Replaced & installed new tile & wall covering throughout
  • Installed new plumbing and a new grease interceptor
  • Set-up new electrical outlets, decorative lighting and wall sconces
  • Installed new FF&E furnished by ownership
  • Installed new food service equipment in the kitchen

Category:
Hospitality

Location:
Arlington, VA

Owner:
Remington Lodging & Hospitality, LLC

Architect:
George Sarfatty, AIA

Contract Value:
$1.2 Million

Duration:
16 Weeks

  • Replaced all FF&E
  • Installed new carpet, wall-covering & tile throughout
  • Food Service Equipment, salving & re-installation

Category:
Hospitality

Location:
Arlington, VA

Owner:
Remington Lodging & Hospitality, LLC

Architect:
George Sarfatty, AIA

Contract Value:
$1.2 Million

Duration:
71 Days

  • First Floor Meeting Rooms, Fitness Center, FedEx and Public
    • Installed steel and tracks for operable partition
    • Put in new drywall, wall-coverings and/or paint
    • Installed new stone tops and new plumbing accessories in the Restroom
    • Installed new rubber flooring in the Fitness Room
    • FF&E Installation
  • Presidential Meeting Rooms
    • Demoed all carpet, wall-covering and lighting
    • Installed new wall-covering, paint, ceiling fixtures and sconces
    • Installed new FF&E
  • Back of House and Corner Pantry
    • Demoed and expanded the area
    • Set up wall framing, along with, telephone/data, plumbing and sprinkler within a rough in electrical
    • Installed new drywall including ceilings, new frames and doors
    • Installed tile flooring and walls
    • Stone Top installation, Millwork installation and Food Service installation
    • New plumbing hook up, electrical and sprinkler trim out
NEWH DC Chapter,
Michelin Maven Sponsor
AGC of America
Allied Member